Back to search results

India - BIS CRS Scheme Phase 4


The Ministry of Electronics and Information Technology (MeitY) has extented the date of implementation of CRS Scheme Phase IV
The date of coming into effect of this Order was 01st October, 2020.  whereas, the issues involved have been discussed with the stakeholders  and MeitY for smooth implementation of the Order. The industry has sought more time for compliance of the Order, it is hereby notified that the date of implementation of the Order stands extended to 01st April 2021.


The Ministry of Electronics and Information Technology (MeitY) has introduced 12 more products (2x LED Luminaries, 5x IT Products, 3x AV Products, 2x House Products) under the BIS CRS Scheme to the Phase IV category:

1. Standalone LED Modules for General Lighting (IS 16103: Part 1: 2012)

2. Lighting Chain (Rope Lights) (IS 10322: Part 5 Section 9: 2017)

3. Keyboard (IS 13252: Part 1 :2010)

4. Induction Stove (IS 302: Part 2: Section 6:2009)

5. Automatic Teller Cash dispensing machines (IS 13252 Part 1 :2010)

6. USB Type External Hard Disk Drive (IS 13252 Part 1 :2010)

7. Wireless Headphone and Earphone (IS 616: 2017)

8. USB Type External Solid-State Storage Devices above 256 GB capacity (IS 13252 Part 1 :2010)

9. Electronic Musical System with input power below 200 Watts (IS 616: 2017)

10. Standalone Switch Mode Power Supplies (SMPS) with output voltage 48 V(max) (IS 13252 Part 1 :2010)

11. Television other than Plasma/ LCD/LED TVs (IS 616: 2017)

12. Rice Cooker (IS 302: Part 2: Section 15: 2009​)


Please find the concerning Gazette notification on the regulated products and standards in the attachment.

There were 49 products (which included Phase 1 , 2 , 3) under MeitY,​ including 5 products solar photovoltaics systems, now MeitY has added 12 more products under phase 4. Till date under CRS,  there are totally 61 products covered (under MeitY).

​Implementation date is 6 months from this notification, i.e October 1, 2020.
TUV Rheinland India can support customers worldwide for BIS CRS for the new added products as well as the previous mandatory products.

MeitY​ has issued the F&Q for  CRS scheme Phase 4

the document  is  attached for your reference-

https://meity.gov.in/writereaddata/files/FAQ_PHASE_IV.pdf

Series Approval of Products for Implementation of “Electronics and Information Technology Goods (Requirements for Compulsory Registration) Order, 2012" – Phase IV" released by Meity.

 

The link to the document from Meity can be accessed through below link:

 

https://meity.gov.in/writereaddata/files/series_guidelines_notified_phaseIV.pdf



Source Link: https://meity.gov.in/writereaddata/files/Phase_IV_Notification.pdf

More about the update

pdf Notification_CRO IV_Extension Download
pdf BIS_CRS_Phase 4 Download
pdf series_guidelines_notified_phaseIV Download
pdf TUVRI Blr - BIS Scope - Phase 4 Download
pdf FAQ_PHASE_IV Download

Contact our experts for a quote

Contact