Module 1
Funds transformation plans for existing networks as well as feasibility studies for new networks. The goal is a comprehensive, actionable plan that integrates technology, the expansion path, climate goals, and economic viability. Half of the eligible costs are subsidized; a project outline is required. A transformation plan for an existing network is often also required by regulators. Alternatively, heat network expansion and decarbonization roadmaps must be developed.
Module 2
Addresses systemic expansion: heat generation, distribution networks, storage, and transfer stations. It builds on Module 1 and provides a 40 percent grant to cover investment costs.
Module 3
It also offers a 40 percent subsidy, but focuses on individual measures. These include, for example, solar thermal systems, large-scale heat pumps, biomass boilers, thermal storage systems, piping for renewable energy generators, and the integration of waste heat.
Module 4
Provides operating cost subsidies for certain systems (e.g., solar thermal systems, heat pumps) for up to ten years after commissioning, limited to the economic gap.
Stay informed—with our newsletter